NATIONAL INFRASTRUCTURE
Building Tomorrow’s Foundation Empowering Nations through Infrastructure Development
Welcome to our National Infrastructure Development project! Here, we are dedicated to advancing our nation’s growth and prosperity through strategic infrastructure initiatives. Our mission is to create a robust and sustainable foundation that fosters economic development, improves connectivity, and enhances the overall quality of life for all citizens.
Purbachal Road Constructions Project - 300 Feet
Purbachal Road Constructions
KNOW MOREArmy ORS Quarter Zia Colony, Dhaka Cantonment
Army ORS Quarter Zia Colony, Dhaka Cantonment
KNOW MOREMIST Officers Mess
MIST Officers Mess
KNOW MOREComilla University TSC Complex & Office
Comilla University TSC Complex & Office
KNOW MOREPurbachal Road Constructions Project
- Project Name: Re-Construction 0f 12.30 Km Road From Kuril Flyover to Kanchan Bridge Intersection (12-Lane From kuril Flyover to Balu Bridge and 10-Lane From Balu Bridge to Kanchan Bridge Intersection)
- Total Length: 3.1 km
- Total Lane: 12
- Drain: Both side RCC U-Drain 6.2 km
- Date of Commencement: July 2019
- Date of Completion: September 2023
Previous
Next
Previous
Next
Army ORS Quarter, Zia Colony, Dhaka Cantonment
- Building: 14 Storied
- Location: Zia Colony, Dhaka cantonment
- Each Floor: 8 Flat
- Total Flat: 104
- Date of Commencement: 03 Mar 2019
- Date of Completion: 02 Oct 2020
MIST Officers Mess, Mirpur Cantonment
- Storied: 13 Storied
- Basement: 02
- Room Type: Vip Room. Vip Lounge, Staff accommodation, Presidential Suits, Kitchen, Dining, Gym, Games Room, Prayer Room, Cafeteria, Twin Bed Room, Double Bed Room.
- Area: 40000 SFT
- Substation, Road Work
- Date of commencement: Jan 2020
- Date of completion: Mar 2024
Previous
Next
Comilla University TSC Complex & Office
- Storied: 5 Storied
- Per Floor Area: 13929.89 Sft
- Total Floor Area: 69649.48 Sft
- Total Pile: 566 nos
- Cafeteria, Multi Purpose Space, Bank
Comilla University Femall Hall
- Storied : 10 storied
- Per Floor Area: 26778.412 Sft
- Total Floor Area: 267784.12 Sft
- Room Per Floor: 39 nos
- Total Room: 391
- Student Capacity: 1126
- Total Pile: 547 nos
Sheikh Hasina Textile Engineering College
- Staff Dormitory: 6 Storied, 52 Pile, 1491 SQM, Residence, 29 Flat, Completion Date December 2023.
- Officer’s Dormitory: 6 Storied, 50 Pile, 1429 SQM, Residence, 24 Flat, Completion Date December 2023.
- Female Hostel: 4 Storied, 69 Pile, 2218 SQM, Residence, 100 Bed, Completion Date December 2023.
- Boys Hostel: 6 Storied, 90 Pile, 8746 SQM, Residence, 200 Bed, Completion Date December 2023.
- Academic Building: 6 Storied, 134 Pile, 4500 SQM, Administrative Building, Completion Date December 2023. Spinning Shed: 2 Storied, 84 Pile, 2880 SQM, Non Residence, Completion Date December 2023.
- Weaving Shed: 2 Storied, 106 Pile, 2147 SQM, Non Residence, Completion Date December 2023.
- Dyeing Shed: 3 Storied, 56 Pile, 1795 SQM, Non Residence, Completion Date December 2023.
AWT Studio Apartment for Senior Officer
- Building: 8 Storied
- Basement: 02
- Type: Studio Apartment
- Location: Mirpur DOHS
- Date of commencement: 25 May 2021
- Date of completion: 31 December 2023